Nissan Altima (L32) 2007-2012 Service Manual: Passenger side
Description
• BCM supplies power.
• Power window motor RH will be operated if power window and door lock/unlock switch RH is operated.
Component Function Check
Power Window And Door Lock/Unlock Switch RH
1. CHECK POWER WINDOW MOTOR RH FUNCTION
Does power window motor RH operate with power window and door lock/unlock switch RH operation? Is the inspection result normal? YES >> Power window and door lock/unlock switch RH power supply and ground circuit are OK.
NO >> Refer to PWC-200, "PASSENGER SIDE : Diagnosis Procedure".
Diagnosis Procedure
Power Window And Door Lock/Unlock Switch RH Power Supply Circuit Check
1. CHECK POWER SUPPLY CIRCUIT
Check voltage between power window and door lock/unlock switch RH connector and ground.
Is the measurement value within the specification? YES >> GO TO 3
NO >> GO TO 2
2. CHECK HARNESS CONTINUITY
1. Turn ignition switch OFF.
2. Disconnect BCM and power window and door lock/unlock switch RH.
3. Check continuity between BCM connector (A) and power window and door lock/unlock switch RH connector (B).
4. Check continuity between BCM connector (A) and ground.
Is the inspection result normal? YES >> GO TO 4
NO >> Repair or replace harness.
3. CHECK GROUND CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect power window and door lock/unlock switch RH.
3. Check continuity between power window and door lock/unlock switch RH connector and ground.
Is the inspection result normal? YES >> Replace power window and door lock/unlock switch RH.
Refer to PWC-291, "Removal and Installation". After that, refer to PWC-201, "PASSENGER SIDE : Special Repair Requirement".
NO >> Repair or replace harness.
4. CHECK BCM OUTPUT SIGNAL
1. Connect BCM.
2. Turn ignition switch ON.
3. Check voltage between BCM connector and ground.
Is the measurement value within the specification? YES >> Replace power window and door lock/unlock switch RH.
Refer to PWC-291, "Removal and Installation". After that, refer to PWC-201, "PASSENGER SIDE : Special Repair Requirement".
NO >> Replace BCM. Refer to BCS-96, "Removal and Installation".
Special Repair Requirement
1. PERFORM INITIALIZATION PROCEDURE
Perform initialization procedure.
Refer to PWC-190, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".
Is the inspection result normal? YES >> GO TO 2
NO >> Check intermittent incident. Refer to GI-42, "Intermittent Incident".
2. CHECK ANTI-PINCH OPERATION
Check anti-pinch operation.
Refer to PWC-190, "ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement".
Is the inspection result normal? YES >> Inspection end.
NO >> Refer to PWC-208, "PASSENGER SIDE : Component Function Check".